Network Planning & Optimization
- Network Planning & Design
- Detail RF Coverage & Capacity Planning
- Cluster Benchmark / Drive test
- In-Building Coverage Drive test
- Radio Frequency (RF) Survey
- Frequency Scanning
- Network Planning Optimization
Site Acquisition (SITAC) Services – for Green Field (GF), Rooftop (RT) and FTTH/FO:
- Site Acquisition Report Lease/Purchase Price Negotiation
- Permitting:
- Environment permit, Government permit, building permit and other permit required for SITAC
a. Site Acquisition (SITAC) for Indoor Building Coverage (IBC):
- Survey for Candidates (building/appartements, hotel, office building, air port and other buildings) base on Customer requisitions, Price Negotiation, permitting another permit required for IBC SITAC
b. Site Renewal for Green Field (GF), Roof Top (RT), BSC and IBC SITES
Civil Mechanical & Electrical (CME)
- Site preparation, Site mobilization/demobilization
- Request new power connection (from local power authority), Upgrade power connection
- Installation and upgrade travo, Generator set cage
- Lightning Protection, Equipment Earthling
- Cable tray setup and installation, Fence and yard
Telecom Implementation:
a. Installation of Base Transceiver Station (BTS) system Indoor & Outdoor
(Micro-Cell & Pico- Cell):
- Site Survey, Installation all BTS and Microwave equipment
- Top-building and In-door Antenna, In-building power, coaxial and fiber optic Cable installation, Installation, testing and commissioning
b. Indoor Building Coverage / IBC / DAS
To make cellular customer comfortable and no signal dropped when they still in the basement area or non coverage area in the building, Cellular operator to deliver high quality wireless communication systems for IBC. The best solution for this situation is develop IBC by using inbuilding wireless communication systems.
MW Transmission Services
a. Line of Sight / LOS Survey
The results LOS Survey is make sure the possibility of MW Link Implementation for two sites (PtP/point to point).The data consist of:
- Site location lay out drawing
- Coordinate of sites, Altitude of sites
- Blocking object (Height of trees, Building, towers, etc) with azimuth Degree
- Terrain condition along the path (Water, sea, Dessert, etc)
- Picture of path, picture of blocking objects
- Installation Design Survey
- Path Profile Analysis
- Path Calculation / Link Budget Analysis
This is the LOS (Line of Site) activities compiling and creating the reports. Our professional and experiences engineers will create the report and compiling the data’s for one LOS Report
b. MW Installation Design Survey:
The activities for MW design survey are to find and make sure the space available for MW equipment’s,
- MW Path Profile Analysis:
- By using the Pathloss, it could be plotting the site coordinates taken from GPS coordinate data’s for the two sites, and could be fixing the MW location either height or direction
- Making reports, which all the report will be showing in Pathloss software drawing sheet, including coordinate, azimuth, altitude, latitude, path distance
